By Frank Jones


There are number of management tools for predicting the movements within a project in progress. One of the best and most used currently is a technique called earned value, a platform that integrates all relevant factors that will realistically plot performance levels. These factors include the calculated values for budgeting, fulfillment of timelines and resources management.

The values used must all be proven, both from previous company work to those now currently being accomplished. These are the parameters that create margins of safety with which to base the completion of future projects. Earned value OH uses what is called data trends to build both visual and quantified patterns that are predictive of any project, whether they represent plus or minus factors, they should be factored values given at the beginning.

The tool accomplishes a set of predictive patterns for the upcoming days of a project. This is done through a comparative monitoring of planned steps against what is actually accomplished from day to day. It is a predictive system that gives data on work progress, whether it is staying on schedule, is well in advance, or has to catch up. With the necessary item on budgeting on a comparative track, items like cost overruns are adjusted for on a daily basis.

The trends within a timeline are better seen with visual charts. The person in charge is in constant track of these trends and will adjust them dynamically with a plan so there is even matching for time and money spent for work done. When the patterns match regularly as the project advances, they are proof of viability.

The negatives and positives, as mentioned, are a given. Taken as a whole, they will form a range wherein anything accomplished is considered of the same values, no matter if there is a plus or negative factor of a few points in terms of allocations and timelines. In any case, they are a given from the beginning, good preparation for execution when managers need to see all that can happen within a planned schedule.

Adjustments are made regularly, with each phase of the project. Budget and time will be added or subtracted in ways that will not impede the flow of the entire process. The control factor in earned value is scope, with time and money spent being the barometers of forward movement.

The technique has a high degree of accuracy, which makes it a great resource. What the company has is maximized, often eliminating the logistical problems of handling more or less than the needed materials attached to any phase. It is a way streamlining the process.

Earned value also bridges the physical distance of management from the field. This is because of the constant monitoring and quantified updates provided. These help them make the most relevant and vital decisions that guides those who are physically accomplishing the work. With precise specifications and metrics, they can easily do scaling and projections. This technique is at its most effective when there are no uncontrolled factors involved.

Accomplishing a set of tasks for one program is always possible. Although the larger the project is, the more problems possible. So that without a control system like earned value, fulfillment can become an impossible objective. It is a valuable tool in managing safe margins of error where money, resources and factors given in time like upcoming weather systems are concerned.




About the Author: